Karo Platinum

Karo Platinum is the newest low-cost, open-pit PGM asset under construction and located on the Great Dyke in Zimbabwe.

A joint venture between Karo Mining Holdings (85%) and Generation Minerals (15%), a Republic of Zimbabwe special purpose vehicle (SPV), the Karo Platinum project has an initial life of 17 years with less than 10% of the 23 903 ha project area having been utilised to attaining this project life.

OUR VISION AND VALUES

Vision statement

To generate value by becoming a globally significant, low-cost producer of strategic commodities that are required to deliver a sustainable future


Values

The safety and health of our people is a core value
We take responsibility for the effect that our operations may have on the environment
We are committed to reducing carbon emissions by 30% by 2030 and have a plan in motion to be net carbon neutral by 2050
We are committed to the upliftment of our local communities
We conduct ourselves with integrity and honesty
We strive to achieve superior returns for our shareholders
We originate new opportunities and will continue to challenge
Previous